Thank you for the video. For those who do not understand what kind of thermal insulation - this is not thermal insulation, these are special mortgages. In this case, as a technology for manufacturing heavy-duty deep piles, but sometimes this is used for temporary conservation of an object.
The pile was probably driven in with the upper cap, and then this temporary part of the concrete was removed to build up the structure further
His knees will soon be finished, if they haven't already. Poor guy, I really feel sorry for him.
nice to meet you.
I would like to know, but after shaving, do you backfill with crushed stone?
Or do you pour concrete to fix the pile and concrete?
I'm studying, but I don't know what to do after this work
Why was it necessary to pour excess concrete and then cut it off. It was possible to initially pour concrete according to the level.
This sequel is in the works, isn't it?
I would like to see what happens to the connection of the reinforcing bars in the legs that will be added
Is it welding, or is it a wire tie similar to a basket connection... Thank you very much.